2021- 2023 Creation of a logistics base
Storage areas need to be strengthened
Identified needs
2021: 3 ha
2022: 5 ha
Forecast over 5 years: 15 ha
2021-2022 Rehabilitation of quay N°1
The quay N°1 is undergoing a rehabilitation operation until September 2022
(project management department).
It will be equipped with 2 cranes (LHM 280 ) in November 2021 and a crane for the future L quay.
Lifting capacity (max.) 84 t
Jib length 40 m
Total weight 241 t
Hoisting/lowering max.90 m/min