QUAY 1
The quay is undergoing a rehabilitation operation until the end of 2021.
It will be equipped with a crane (LHM 420) in October 2021
Storage area : 11 000 m²
Equipped for 24/24 work
LAFARGE ciment silos on site
Storage
capacity
(580 TEUs)
- Yard A19 : 240
- Yard A20 : 90
- Yard A33: 248
OIL & GAZ Terminal
LOA : 230 m, draft :10 m
QUAY 2
Storage capacity RTG
- Yard A02 / Transhipment : 875
- Yard A03 / FCL : 875
- Yards B06-B07 / Delivery : 2x 875
Storage capacity (TEUs)
- Yard A22 Flatsracks : 44
- Yard A05 : Reefers : 236
- Yard B03 : Flats
- Yard B04 /empty reefers : 200
- Yards B01 –B02 / Empty containers : 1000
Storage area :
9 ha > will be extended to 14 ha in 2022
Quay 2 > Containers terminal
Quay 1 > ships up to 160 m in length draft: 10 m
Petro-gas Terminal (2009)